I kept telling myself I'd eventually get rid of it and replace it with a shower.
Then one night I step the wrong way and crack the tub.
So in February it got taken out. It was a shell tub meant to go over an older porcelain- type tub. But there wasn't anything under the shell which is why it eventually cracked.
Due to tile guy #1 deciding he had better things to do than deal with my shower, 2 months later - I'm finally seeing a possible end to not having a shower in my own house!
The bathroom floor will also be retiled. But I'm going to ask my tile guy to please let me have my shower for at least a day before the bathroom floor gets removed.
See photos below. :-)
Heath tearing out the old stuff.
Heath installing drywall.
Heath being a plumber.
Left photo - lip between shower and bathroom floor.
The lip got removed because I didn't like it. :-)
Too big.
Liner getting prepped. |
Liner getting installed. |
And we wait...... |
Shower Walls and Floor |
Bathroom Floor |
Greg installing liner.
I love my shower floor!!
Bathroom floor with grout!
Close up of bathroom floor.
I finished painting! See photos below.